High Quality Shredder Blades
Shredder blades are important components of shredders, and their quality directly affects the processing cycle of waste materials.
As an important crushing tool on the shredder, shredder blades can be classified based on the shredder structure into multi-shaft shredder blades (including double-shaft shredder blades and four-shaft shredder blades) and shredder rotor blades .
Shredder Blades
Multi shaft shredder blades, also known as claw blades, can be custom-designed based on the specific requirements of different machines. They are installed on double shaft or four shaft shredders and are generally classified into 3 claw shredder blades, 8 claw shredder blades, 12 claw shredder blades, etc. These blades are used for crushing, tearing, and compressing to reduce the size of materials. This type of shredder blade is widely used in the crushing of waste plastics, waste rubber, wood, and other large-volume waste materials.
Our Multi Shaft Shredder Blades Serve In
Double Shaft Shredder
Four Shaft Shredder
Technical Parameters
| Shredder Model | Blade Outer Diameter (mm) | Hex Socket (mm) | Blade Thickness (mm) | Blade Spacer Outer Diameter (mm) | Blade Spacer Thickness (mm) |
| 200 | Φ150 | 70 | 12 | 110 | 12.2 |
| Φ150 | 70 | 15 | 110 | 15.2 | |
| 300 | Φ180 | 80 | 15 | 120 | 15.2 |
| Φ180 | 80 | 20 | 130 | 20.2 | |
| 400 | Φ200 | 90 | 10 | 150 | 10.2 |
| Φ200 | 90 | 15 | 150 | 15.2 | |
| 500 | Φ200 | 90 | 10 | 150 | 10.2 |
| Φ200 | 90 | 20 | 150 | 20.2 | |
| 600 | Φ200 | 90 | 15 | 150 | 15.2 |
| Φ250 | 140 | 20 | 180 | 20.2 | |
| 800 | Φ300 | 160 | 25 | 220 | 25.3 |
| Φ350 | 180 | 30 | 250 | 30.3 | |
| 1000 | Φ350 | 180 | 30 | 250 | 30.3 |
| Φ400 | 200 | 40 | 300 | 40.3 | |
| 1200 | Φ400 | 220 | 30 | 320 | 30.3 |
| Φ450 | 220 | 40 | 350 | 40.3 | |
| 1500 | Φ450 | 240 | 50 | 380 | 50.3 |
| Φ500 | 260 | 30 | 400 | 30.3 | |
| 2000 | Φ550 | 280 | 50 | 420 | 50.3 |
| Φ700 | 360 | 60 | 520 | 60.3 |
Blade Features
Advanced CNC processing
Mature heat treatment process
Strict quality inspection
High-quality materials
Frequently Asked Questions
How do you improve production performance?
There are a number of ways to improve production performance, including material upgrades, wear coatings, cryogenic treatments, and/or surface treatments. Edge geometry modifications are another area to explore, as well, to improve production performance.
Where do you manufacture?
We have many manufacturing facilities to accommodate competitive pricing, purchasing of low volume quantities, and quick delivery. Our plants are in Lishui Industrial Park, Nanjing City, Jiangsu Province,China
Do you offer discounts for volume purchases?
Pricing is often influenced by volume – the more pieces we can run in a batch, typically the lower our production costs are. We do offer volume price breaks, and we also have a robust blanket order process available to help you take advantage of volume pricing.
Do you offer stocking programs?
Yes, we offer vendor managed stocking programs. Ask your sales representative today if this applies to you.
What is your standard lead time?
Standard lead time can vary by product type, but as a general rule of thumb, lead times for items that are not in stock (and we stock 50% of our annual sales volume) run 4 to 6 weeks after receipt of your order.